I went to Putrajaya Post Office to realized this maxi card showing Sri Saujana Bridge in Putrajaya using one of the stamps issued on April 20, 2009. The left top corner of the stamp has an image of Sri Saujana Bridge. It was said that the bridge was built at a cost of RM76 million. It was completed on May 31, 2003.